John Paterno Hugo - Boiler Team Lead - CENTRAL AZUCARERA

Prepare - Material take-off Tracking of of Materials (BOM) from shop drawing as reference for progress measurement update drawing register and ensure that it matches with Engineering Updates Coordinates with Material Control Section regarding status of materials

Learn More

CFB Boiler Supports - Buckstays | BMCC Ltd

Our partners assigned the next task in a row to our reliable team We were involved in developing the fabrication drawings for buckstays They are part of the equipment that supports a for a power plant in Europe The built BIM model improved the communication between all involved engineers

Learn More

Khumbulani Nkala - Package Lead Boiler 5 and 6 - Murray

Construction Manager of a team (5 supervisors 10 foreman and 150 artisans) responsible for installing mechanical components of a 800MW unit 3 The cost of the scope of works is valued at R100 million per year The scope of works involved installing mechanical components duct